My Home in France

électricien anglais
Property Owners Choice
firkinwebs

Home Site Plan Holiday Rental

1 2

1, Shows the patio area of the house we were able to paint the rendered part of the house the un-rendered part will need more work before paint is applied, planned for next year.
2, The west view of the house this end get the majority of the weather thrown at it, we have given it three coats of paint to ensure it is ready for the rain.
3 4

3, The North view or front of the house the walls were painted in the daytime as this side gets less sun light than all the other walls.
4, The west end of the house this where the balcony or terrace is situated, it is a new extension built for the bathroom and inside toilet. The whole area needs rendering before paint can be applied.
5 6 7

5, The shower area when we took ownership of the property, the bathroom was just a concrete shell with a bath, sink and water heater fitted. The exterior outside walls did have plasterboard fitted, and pipes were in place although not all were connected
6, Partially completed shower we also wanted to add a shower; this will allow the bath to be removed for floor tiling later on. The bathroom was just a concrete shell with the bath and sink and pipe work fitted around. After buying the base, we made a wooden frame to allow the pipe work through to the water cylinder and the waste to drain.
7, The shower door, some basic white tiles a stand the side wall of the shower was constructed with wood and overlaid with plasterboard, and then tiled just the plumbing left to do.

Next

Site Plan

Contact Information

If you would like any information on what you have seen on this web site please feel free to contact us at a reasonable hour.

Telephone:06 68 72 80 23

FAX France 0033 2 72 68 57 98 . FAX UK 0044 8707622491

Postal address: La Boutellerie, 36140 Aigurande France

Andy Firkins click on name to email

Copyright © 2005 - 2010 Andy Firkins Maintenance Services
Last modified: 3 February, 2010