One of the final jobs in the lounge to do was to replace the weak lintel in the old barn window. It was going to be obsured by the stairs but since the design change we are able to keep it as a feature.
As with all these job the detailed planing allowed the replacement to be done in an hour or two with out disturbing the stones above . .
The tiles for the bath arrived.
The work continued outside on the final opening
The units in the utility room were purchased and installed
|