The kitchen wall which is below ground level is repointed with lime mortar and a water proofing additive.
Damp course membrane and double insulated
Steels installed
Marine ply is used for the lower section
Electrics installed
Lights and a little wiring on the GTL
Copyright © 2005 - 2010 Andy Firkins Maintenance Services
Last modified:
3 February, 2010